A unique project proposed and constructed to guarentee water supply for the City of Cumming during excessively low lake levels. GeoSystems completed the geotechnical investigation for the intake facility and for the approximate 3000 foot long intake extension which involved rotary drilling performed from the surface of a floating platform during rough conditions. Check out the profile and pictures!
A large embankment constructed through wetlands near the Savannah/Hilton Head International Airport. The project profile currently only describes the initial investigation portion. The embankment is complete and the track is in service as of May 2012. A thourough discussion of the embankment design and construction process will uploaded soon.
This project involved an investigation and monitoring of new large storage tanks. Construction involved aggregate piles.
Projects Online
We are currently updating our online collection of project profiles. The projects described and made available online offer an overview of the entire project and highlights the role of GeoSystems and significance of geotechnical engineering to the success of each project. Project profiles include high-quality pictures and detailed project background. Each project description is available for download in pdf format. A list of notable projects is also available.
ASSORTED PROJECT PHOTOGRAPHS